Southwest Plaza Mall Renovation, Denver, CO

Retail

This involved a complete redesign of the mall. The Synergi Crystal cantilevered clear glass and slim dark bronze top cap plays into the design drawn from the ski-lodge look and feel, while creating a much more inviting and open space.

 

PROJECT HIGHLIGHT

Synergi’s dedicated preconstruction team identified substantial cost savings in the design details of the railing attachment and bulkhead design. This resulted in a saving of over $250,000 to the project and a shortened project timeline.

 

LINEAR FEET OF RAIL

2,800

 

SCOPE OF WORK

Preconstruction, design and engineering, fabrication, installation